Mike va3mw, Nigel ve3id, Neil ve3sst, and Nathan va3nxp spent the day (October 19) working on mostly antennas. There was lots of tower climbing by Mike and Nathan while Neil and Nigel had to deal with digging up the 1 5/8" feedline and changing the connector.

  • The 2M 4 Bay was moved to the East tower to become the new 2M DSTAR antenna
  • 2M VHF vertical was installed on top of the west tower. This should improve VE3RPT's coverage
  • 2M DSTARs coverage should be much more improved as the antenna is installed 60ft higher (Ramesh --- this is for you!!! 🙂 ) 145.250Mhz - Let us know how it works in Mississauga now.
  • The entire 1286Mhz feedline was inspected, cut, drained. The coverage still has issues so that leaves issues with the antenna, duplexor, top connector or the repeater itself. We will figure this out, it is just going to take more time. About 3M of feedline was cut off and the bottom connector remounted.
  • The 220 repeater is still stand alone. We couldn't find any antenna problems (yet), but I did notice that the RF out was only 3 watts from the radio. This will limit its coverage. We will up this to close to 50w with the new repeater installation.
  • I have started to remove hardware to integrate into the new controller, so in doing so, I have been removing hardware from the hill. With that, the hub is offline and IRLP is offline.